EUR 483.000
FOTO'S WORDEN LADEN ...
Appartement & Condo (Te koop)
Referentie:
EDEN-T96682578
/ 96682578
Referentie:
EDEN-T96682578
Land:
PT
Stad:
Aldoar Foz Do Douro e Nevogilde
Categorie:
Residentieel
Type vermelding:
Te koop
Type woning:
Appartement & Condo
Omvang woning:
100 m²
Kamers:
2
Slaapkamers:
1
Badkamers:
1
VERGELIJKBARE WONINGVERMELDINGEN
GEMIDDELDE WONINGWAARDEN IN NEVOGILDE
VASTGOEDPRIJS PER M² IN NABIJ GELEGEN STEDEN
Stad |
Gem. Prijs per m² woning |
Gem. Prijs per m² appartement |
---|---|---|
Matosinhos | - | EUR 3.894 |
Porto | EUR 3.692 | EUR 4.168 |
Canidelo | - | EUR 4.488 |
Maia | EUR 2.248 | EUR 2.566 |
Maia | EUR 2.073 | EUR 2.541 |
Vila Nova de Gaia | EUR 2.599 | EUR 3.451 |
Gondomar | EUR 1.896 | EUR 2.199 |
Valongo | EUR 1.764 | EUR 1.870 |
Espinho | - | EUR 3.421 |
Santa Maria da Feira | EUR 1.723 | EUR 2.023 |
Paredes | EUR 1.854 | EUR 3.306 |
Ovar | EUR 1.809 | EUR 2.129 |
Feira | EUR 1.761 | EUR 1.838 |
Vila Nova de Famalicão | EUR 1.468 | EUR 1.842 |
Ovar | EUR 1.785 | EUR 2.016 |
Oliveira de Azeméis | EUR 1.507 | - |
Esposende | EUR 2.283 | EUR 2.544 |
Esposende | - | EUR 2.226 |
Marco de Canaveses | EUR 2.099 | - |
Nascente/poente.
Novo empreendimento na Foz do Douro, a 2 minutos a pé do mar.
Composto por três T1 e dois T3 duplex, com elevador.
Com exposição solar, nascente/poente, dispondo de luz todo o dia.
Todas as frações dispõem de terraço, varanda ou jardim.
O edifício irá disponibilizar postos de carregamento para bicicletas e trotinetes elétricas, no interior das arrecadações individuais, que beneficiarão de energia 100% renovável produzida por painéis fotovoltaicos.
A preocupação com o conforto e funcionalidade está presente em todos os detalhes do edifício, que apresenta uma escolha de materiais de grande qualidade e durabilidade.
Obra com início previsto em abril e, conclusão em dezembro de 2025.
Para quem procura qualidade de viver onde tudo acontece!
António Manuel Cunha Soc. Unipessoal, Lda.
Rua de Cedofeita, 342 - Porto
AMI 13288
Categoria Energética: A
New 1 bedroom apartment with 100 m2 and balcony.
East/west.
New development in Foz do Douro, 2 minutes walk from the sea.
Consisting of three T1 and two T3 duplex, with elevator.
With sun exposure, east/west, providing light all day long.
All fractions have a terrace, balcony or garden.
The building will provide charging stations for bicycles and electric scooters, inside the individual storage rooms, which will benefit from 100% renewable energy produced by photovoltaic panels.
Concern for comfort and functionality is present in every detail of the building, which features a choice of high quality and durable materials.
Work scheduled to begin in April and be completed in December 2025.
Energy Rating: A Meer bekijken Minder bekijken Apartamento T1 novo com 100 m2 e varanda.
Nascente/poente.
Novo empreendimento na Foz do Douro, a 2 minutos a pé do mar.
Composto por três T1 e dois T3 duplex, com elevador.
Com exposição solar, nascente/poente, dispondo de luz todo o dia.
Todas as frações dispõem de terraço, varanda ou jardim.
O edifício irá disponibilizar postos de carregamento para bicicletas e trotinetes elétricas, no interior das arrecadações individuais, que beneficiarão de energia 100% renovável produzida por painéis fotovoltaicos.
A preocupação com o conforto e funcionalidade está presente em todos os detalhes do edifício, que apresenta uma escolha de materiais de grande qualidade e durabilidade.
Obra com início previsto em abril e, conclusão em dezembro de 2025.
Para quem procura qualidade de viver onde tudo acontece!
António Manuel Cunha Soc. Unipessoal, Lda.
Rua de Cedofeita, 342 - Porto
AMI 13288
Categoria Energética: A
New 1 bedroom apartment with 100 m2 and balcony.
East/west.
New development in Foz do Douro, 2 minutes walk from the sea.
Consisting of three T1 and two T3 duplex, with elevator.
With sun exposure, east/west, providing light all day long.
All fractions have a terrace, balcony or garden.
The building will provide charging stations for bicycles and electric scooters, inside the individual storage rooms, which will benefit from 100% renewable energy produced by photovoltaic panels.
Concern for comfort and functionality is present in every detail of the building, which features a choice of high quality and durable materials.
Work scheduled to begin in April and be completed in December 2025.
Energy Rating: A